Joined
·
550 Posts
i am wondering if this is the correct sketch for the 2.7... bcause the onlyway i could find to fit perfeclty was to put the bushing in the back of the pulley and washer in front. this is the only way i found to match perfectly ... but this sketch tell me another story lol...
found this other sketch now i am confused ...hope can some 1 can check tell me how it really goes ... have a 2 hour trip on saturday... i want to be on the safe side taking family out....
heres another 1 but i can't really see ...

found this other sketch now i am confused ...hope can some 1 can check tell me how it really goes ... have a 2 hour trip on saturday... i want to be on the safe side taking family out....

heres another 1 but i can't really see ...
